EN - How to set the pump/valve flow alarm
Question:
How to set the pump/valve flow alarm
Answer:
- Browse to 'Hoogendoorn / Control water / Valves / Valvgroup 1 (2, 3 or 4) / tab alarms'. The average flow and the permitted deviation must be set correctly. After a number of correct irrigation cycles the average flow can be read on the 'Measure & Actuate' tab.
- Browse to 'Hoogendoorn / Control water / Water supply unit / Pump / tab alarms'. The delay time of a flow alarm can be set. Don't make it too long.
- Browse to 'Hoogendoorn / Control water / Crop section / Crop section control / tab alarms'. Here it is set which action should be take place as soon as a flow alarm occurs. A flow alarm occurs as soon as the flow deviates more than the permitted deviation for longer than the set delay time. By default, the pump stops at a flow alarm, by switching on the checkmarks it can be chosen to be alarmed but the pump will not be stopped. The advice is to always stop the pump for a flow alarm out of safety for crop or installation damage.
Related Articles
EN - How to work with +Active Air valve
Question How do I work with +Active Air valve? Answer The Active Air valve is used in the following situations: In the example above the valve is opened from 0 to 100% when the greenhouse temperature is from 20 to 22 (=20 + 2) °C. With the ...
NL - Hoe los je een alarm op
Vraag Hoe los je een alarm op? Antwoord In de alarmbalk vind je de alarmen (zie bovenstaande alarmbalk). Op dit moment zijn er 19 algemene alarmen, 2 wateralarmen, 4 energiealarmen en 12 klimaatalarmen. In totaal 37 alarmen. Algemene ...
EN - How can the valve type be set for the visualization symbol
Question How can the valve type be set for the visualization symbol? Answer Three types of valve can be displayed in a visualization, an standard valve, a double valve and a pump. This article describes how this type can be set (available from ...
EN - How can I set the pump to start and stop automatically based on a level measurement?
EN - How can I set the pump to start and stop automatically based on a level measurement? First the various controls must be correctly connected. Click here to check this. Then the settings of the various controls could be set correctly. 1. Set ...
EN - All info about visualization
Question What information is available about visualization? Answer How to create a visualization How to use Microsoft Visio shapes for visualizations Which background images does Hoogendoorn have for visualization How to add a background in a ...